Section 1 of the Urban Infrastructure Renewal and Renovation Project in Kuerleba Prefecture, Xinjiang
Under the triple ultimate challenge of "large temperature difference+long distance+ultra long river crossing pipe", this project has completed the first domestic UV curing repair project with a one-time repair of 248.5 meters.




